When you buy a new apartment off-plan in Cyprus, you do not pay the full price on day one. You pay a reservation fee, a larger sum when you sign, then instalments as the building reaches agreed stages, and the balance at handover. Typical splits are 20–30% on signing, 40–60% across construction and 10–20% at completion. This guide explains how stage payments work, how VAT is added and what to agree before you sign.
It is general information, not legal or tax advice, and every developer's schedule is different.
How a typical payment plan is structured

The ranges above come from index.cy's off-plan guide (June 2026). Other sources are close: a DOM guide (updated November 2026) quotes 30–40% on signing and 10–20% at each later stage.
- Reservation. A fee, often a few thousand euros or 1–5% of the price, takes the unit off the market while your lawyer does the checks. It is normally deducted from the next payment. Ask in writing whether it is refundable.
- Contract signing. The first large payment, commonly 20–30%.
- Construction stages. Usually three or four payments tied to milestones such as foundations, the concrete frame, walls and roof, and internal finishes.
- Completion. The balance when the apartment is finished and handed over.
A worked example

Take a €300,000 apartment with a €5,000 reservation, 25% on signing, three stage payments of 20%, 20% and 15%, and 20% at handover. The table shows the amounts and the VAT added to each.
| Stage | Share | Payment | VAT at 5% | VAT at 19% |
|---|---|---|---|---|
| Reservation | – | €5,000 | €250 | €950 |
| Contract signing | 25% less reservation | €70,000 | €3,500 | €13,300 |
| Frame complete | 20% | €60,000 | €3,000 | €11,400 |
| Walls and roof | 20% | €60,000 | €3,000 | €11,400 |
| Finishes | 15% | €45,000 | €2,250 | €8,550 |
| Handover | 20% | €60,000 | €3,000 | €11,400 |
| Total | 100% | €300,000 | €15,000 | €57,000 |
This is an illustration, not a SquareOne schedule. It assumes the whole price qualifies for the rate shown.
How VAT works on stage payments
VAT on a new home is charged as you pay, stage by stage. The standard rate is 19%. A reduced 5% rate applies to a main residence, on the first 130 m² and up to €350,000 of value, provided the home is no more than 190 m² and €475,000 in total. index.cy notes that the application for the reduced rate is made once the contract is signed and a payment has been made, and that the home must remain your main residence for ten years or part of the saving is repaid. Our VAT guide explains the conditions in full.
One cost has gone: stamp duty no longer applies to contracts signed from 1 January 2026, under Law 239(I)/2025.
Paying with a mortgage
Banks do lend on off-plan homes, usually releasing the loan in tranches that follow the payment schedule, after checking progress on site. Expect to fund the reservation and the signing payment from your own money, and get a mortgage offer in principle before you sign so the bank's timing matches the developer's.
Some developers also offer instalments after completion. DOM describes interest-free developer instalments as a common arrangement. Read the terms closely: who holds the title until you have paid, and what happens if you pay late.
What to agree before you sign
- Link payments to stages, not dates. Each instalment should fall due when a defined stage is complete, not on a calendar date. Ask how completion of each stage will be confirmed, for example by a certificate from the project's architect or engineer.
- A clear completion date, with consequences. Agree a long-stop date and compensation if the developer is late. DOM points out that late-delivery penalties apply only if they are written into the contract.
- What happens if you pay late. The contract should say how much notice you get and what interest or penalty applies.
- Protection for your money. Some developers offer a bank guarantee on stage payments. Ask, and have your lawyer review the terms.
- Register the contract. Deposit it at the Land Registry promptly under the Specific Performance Law. This stops the developer selling or mortgaging the unit against you.
For the full process, from developer checks to handover, see our guides to choosing a property developer in Limassol and to off-plan versus ready homes.
For the whole process in order, from reservation to handover, use our step-by-step checklist for buying off-plan property in Cyprus safely.
Why buyers choose stage payments
Paying in stages spreads the cost over the build and fixes the price at today's level. It also means you only pay for what has been built. The trade-off is that you wait for your home and depend on the developer finishing on time, which is why the checks above matter.
If you would like to see the payment schedule for a SquareOne project, contact our team or browse our current projects.
Frequently asked questions
How much deposit do I need to buy off-plan in Cyprus?
Typically a reservation fee of a few thousand euros or 1–5% of the price, then 20–30% when you sign the contract. The rest is paid in stages as the building goes up and at handover.
Is VAT charged on each off-plan payment?
Yes. VAT is added to each payment as you make it: 19% as standard, or 5% on a qualifying main residence within the size and value limits.
Can I use a mortgage for an off-plan apartment in Cyprus?
Yes. Banks usually release the loan in tranches that follow the construction stages. You normally pay the reservation and the signing payment from your own funds.
What happens if the developer is late?
That depends on your contract. Compensation for delay applies only if it is written in, so agree a long-stop completion date and penalties before you sign.
Do I pay stamp duty on an off-plan contract?
Not on contracts signed from 1 January 2026. Stamp duty was repealed by Law 239(I)/2025 from that date.
Обновлено
Об авторе

Co-Founder and COO, SquareOne
Nikitas Papadopoulos is Co-Founder and COO of SquareOne. A Master of Architecture graduate of the Architectural Association in London, he leads how SquareOne's vision becomes built homes, from design through project delivery to everyday life in them.
- Master of Architecture, Architectural Association, London
- Design and project delivery